Project Description

Equipment – high H2S gathering system, treating system, compressor, metering and production equipment

Scope – Provide project management, construction contract management, and detail design for entire facility. Skid mounted treater was provided by client. Select Engineering, Inc. was involved from pre-selection process studies, conceptual design, preliminary design, final design and construction all the way through start-up and commissioning.

Facility capacity – 15 MMSCFD