Project Description

Equipment – Facility included compressors, new pipelines into facility, amine treater, glycol dehydration, measurement, and vent gas incinerator. Inlet gas was 4.5 MMSCFD at 20% CO2

Scope – Provide project management, construction contract management, and detail design for entire facility. Skid mounted Amine treater was provided by client. Select Engineering, Inc. was involved from conceptual design, site selection, and AFE approval all the way through start-up and commissioning.

Facility Capacity – Design flow was 4.5 MMSCFD at 20% CO2 , but after start-up facility was treating 6.3 MMSCFD at 12-16% CO2 due to combination of nearby gathering systems